How Long To Install Inground Pool: A Complete Guide To Timelines And Factors Influencing The Process

Add $15 to $80 per square foot for site prep, foundation, utility construction, finishings, and assembly. The average modular home costs $80 to $160 per square foot, or $120,000 to $270,000 installed. Modular home prices are $50 to $100 per square foot for the base unit only. Setting up and installing a modular house adds $30 to $60 per square foot. Arrange for the dirt to be reused as filler if possible, and for your pool builder to remove the excess. Otherwise you’re going to end up spending a number of weekends with a wheelbarrow.

Size and Features


With a concrete pool, there’s no pre-made pool liner; you’re getting a custom pool. Your contractor will have a gunite or shotcrete crew handle the special mixture, and then you need to wait for it to cure before you do anything else. Depending on the size, gunite/shotcrete can take a week or a little longer to cure completely. Once you’ve got the design and all the correct permits, the excavation part of the construction process shouldn’t take long at all. Most contractors can do it in a week (or less), but depending on the size of your pool, it could take slightly longer.

Can Modular Homes Be Extended or Modified After Installation?

A contractor or subcontractor can perform an site inspection and assess your specific needs. The process for finishing the pool and surrounding area involves several steps, including installing the pool decking, landscaping, and any necessary fencing or safety features. The pool decking will be installed around the perimeter of the pool, providing a safe and stable surface for swimmers to enter and exit the pool. The landscaping will be completed, including the installation of any necessary plants, trees, or other features. The installation of the pool equipment and plumbing typically takes around 2-5 days to complete, depending on the complexity of the system and the location of the equipment. movable bulkhead swimming pool , including the pump, filter, and heater, will be installed in a designated area, such as a pool house or equipment pad.

Plumbing and Electrical Work

Additionally, you should ensure that the builders can get into your yard easily with heavy machinery. Fiberglass pools are the simplest to install and take the least amount of time to build. So, if you want your pool up and running as soon as possible, I recommend choosing a fiberglass pool. Another thing to consider when building your pool is the pool contractor labor force in your region. If your town has limited pool contractors, you should expect your pool to take longer to build as the labor force will be stretched thin.

Finishing Touches


rehab pools progorki.com

Ensuring a smooth pool installation involves careful planning and execution. By focusing on key areas, you can minimize delays and hurdles during the process. When you choose Pool Perfection, you’re not only selecting a company known for superior quality but also one that values your time and ensures a faster pool construction experience. Our efficient processes, skilled craftsmen, and attention to detail are the reasons behind our ability to complete projects swiftly.

Turn Key = We Handle it ALL!


Once you agree on the design and budget, a 5% deposit kickstarts the construction of your new home. Modular homes are a good investment because they increase in value over time, like any other property. Plus, they’re more energy-efficient and last as long as site-built homes. The highest appreciation rates are for modular homes with a permanent foundation that includes the land and building ownership. Modular homes last for as many years or longer than regular stick-built homes. Modular homes use higher-quality materials and construction, which means lower maintenance costs.

Install in 2-3 Days

The fiberglass shell comes pre-manufactured, which means we’re not building it on your property. Once it arrives, our team will lower the shell into place, connect your pool pump and filtration system, and fill your pool with water. Securing permits is one of the very first steps in your pool project, and depending on where you live, this can take anywhere from 1-6 weeks, sometimes even longer. Even if you’ve met all the city regulations and you’ve found a crew to build your pool, that doesn’t mean you might not still run into a mishap. It might take a week or two for the correct materials or pre-made pool liner to become available. As I mentioned above, poor weather can be a potential delay when building an outdoor pool.

Plumbing and Electrical Installation

In Australia, the demand for pool builds increases during the summer months, with many homeowners looking to enjoy the warm weather by taking a dip in their new pool. As a result, it's important to plan your pool construction project accordingly to ensure that you can enjoy a full summer season in your new pool. Modular homes are built to adhere to the same building codes as traditional homes, making them equally capable of withstanding Ireland’s temperamental weather conditions. These tips foster a streamlined installation process, contributing to a timely and efficient pool setup. No major permits are generally needed for above-ground pools, streamlining the process. Understanding these can help you set realistic expectations and better plan your project. Pre-built homes range in price from $60 to $275 per square foot, depending on the brand, size, floor plan, and customizations selected. Modular home permits cost $500 to $4,000 on average, depending on the state and size of the home. movable floor aquatic therapy pools with quick installation is generally faster; it typically takes about 1 to 3 weeks once the site is prepared. Vinyl-liner pools usually fit between these options, with installation primarily dependent on the liner and wall preparation. During the preparation phase, you’ll focus on planning and gathering materials. First, you need to confirm your pool design and layout based on your yard’s dimensions. Check your property for underground utilities to avoid any disruptions. Afterward, choose a reliable contractor and finalize your project timeline. The initial consultation and design process are crucial steps before starting pool construction, as they set the foundation for a successful project. The pool construction process has several stages, each with its own timeline. From design to finish, every step matters in your backyard paradise. If you’re thinking of adding a backyard pool to your Orange County, CA home, one of the first questions you might ask is, “How long does it take to build a pool? ” The answer isn’t as simple as you’d hope but we’ll break it all down for you so you have a clear understanding of the pool construction process and timeline. The actual on-site assembly of modular buildings is impressively swift.